
EonStor / EonStor DS S12/S16/S24 Series
System model numbers with a designated “N” are powered by DC PSUs.
The kit is for DC PSU systems only and the earth lead kit
MUST
be installed before you power
on your system. The earth lead cable, dedicated screws and cage nut can be found in the
accessory box. It is recommended to install the earth lead kit once the enclosure has been
installed into the cabinet.
To install, attach one end of the earth lead cable to the enclosure and secure it with the
dedicated screw as shown in the illustration below:
Attach the other end of the earth lead cable to the
cabinet rack post with the dedicated screw. If your
cabinet rack post does not come with screw threads,
use the cage nut provided to secure it to the rack
post.
69
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...