EonStor / EonStor DS S12/S16/S24 Series
System model numbers with a designated “N” are powered by DC PSUs.
The kit is for DC PSU systems only and the earth lead kit
MUST
be installed before
. The earth lead cable, dedicated screws and cage nut can
be found in the accessory box. It is recommended to install the earth lead kit once
the enclosure
stalled into the cabinet.
To install, att
d cable to the enclosure and secure it with
the dedic
you power on your system
has been in
ach one end of the earth lea
ated screw as shown in the illustration below:
Attach the other end of the earth lead cable to
the cabinet rack post with the dedicated screw.
If you
st does not come with
ed to
secure it to the rack post.
r cabinet rack po
screw threads, use the cage nut provid
189
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...