![Infineon Technologies XC2200 Скачать руководство пользователя страница 374](http://html1.mh-extra.com/html/infineon-technologies/xc2200/xc2200_user-manual_2055439374.webp)
XC2200 Derivatives
System Units (Vol. 1 of 2)
System Control Unit (SCU)
User’s Manual
6-114
V2.1, 2008-08
SCU, V1.13
Asynchronous/Synchronous Continuation
An asynchronous continuation event is defined if both selected PVC OK signals (from
PVC_M and PVC_1) match their configured action level.
A synchronous continuation event is defined by the system clock for DMP_M divided by
the value of bit field SEQzSTEPx.SYSDIV. Each time a step is started with the system
clock enabled for DMP_M a synchronous continuation trigger is generated after SYSDIV
system clock cycles.
Whenever the required continuation event occurs the next step is executed.
This configuration is ignored if the step is configured to be skipped.
6.5.5.4
Trigger Handling during a Power Transition
A power transition is an atomic operation. This means that it has to be finished before
any new active can be performed. Triggers that request an other power transition
occurring a currently performed power transition are stored automatically and trigger the
next power transition immediately after the currently one is finished.
6.5.6
Operating a Power Transfer
Performing a power transfer requires several steps that need to be executed involving
both hardware and software operation. The transfers between the different Operating
Modes are described in the Programmer’s Guide.