This document is property of NIIGATA POWER SYSTEMS CO., LTD. It must be neither reproduced nor communicated nor published without permission.
SECTION
2
- OPERATING INSTRUCTION
2.8 PREPARATION OF ENGINE EXTENDED
SHUTDOWN
2-8-02
- Starting air systems
- If the engine is to be disconnected from the starting air reservoir, make certain
that the inlet and outlet ports are sealed to prevent dirt and moisture from entering
the system.
- Intake and exhaust systems
- Place silica gel in the intake air duct and seal the duct as required to keep out
about 60-80 grams of dirt and moisture. Make certain that a conspicuous tag is
attached so that the seal and gel will be removed before the engine is put back
into service.
- Seal the turbocharger air inlet.
- Seal the exhaust pipe.
- Accessories
- Seal the inlet and outlet ports of the starting air reservoir if the lines are
disconnected.
Содержание NIIGATA MG(L)26HLX
Страница 1: ...DOCUMENT No 2086X 50000D REMARKS 12 2021 INSTRUCTION MANUAL FOR NIIGATA DIESEL MODEL MG L 26HLX...
Страница 2: ......
Страница 34: ......
Страница 38: ......
Страница 40: ......
Страница 60: ......
Страница 66: ......
Страница 68: ......
Страница 80: ......
Страница 82: ......
Страница 86: ......
Страница 88: ......
Страница 94: ......
Страница 107: ......
Страница 108: ......
Страница 110: ......
Страница 130: ......
Страница 132: ......
Страница 170: ......
Страница 174: ......
Страница 186: ......
Страница 188: ......
Страница 192: ......