Innovative Circuit Technology Ltd.
7
openings,
(“On” or “I” facing up, “Off” or “0” down
) ensuring the breaker
connector tabs securely seat in the LDM breaker sockets.
•
Install Power Modules with the same voltage rating in any remaining
open chassis positions. The modules will share the total output load and
may be “hot
-
swapped”
(you can insert or remove a module while the
system is powered). Ensure the combined power rating of all the
installed power modules exceeds the total requirement of the planned
load by at least 700W for true N+1 redundant operation. N+1 operation
requires excess power module capacity to ensure that the load can be
fully powered, even if one power module should fail or be removed.
•
Carefully align each module with the internal guides and firmly push into
the back plane until the module latch clicks into place, and the module
is flush with front panel. Power Modules can be easily removed by
pressing the release latch located under the module handle while firmly
pulling the module from the power chassis (Figure 2). The system may
remain powered while swapping modules.
•
Snap in blanking plate (ICT-BPM) if ordered into any unused Power
Module positions to prevent accidental access to the internal circuitry of
the system.