Innovative Circuit Technology Ltd.
13
-48V, -24V or -12V power systems; each output = POS V, for +48V, +24V or +12V
power systems).
Verify the polarity of your MPS Ultra, and then connect up to twelve external
loads using appropriately rated wire inserted and torqued in the cage-clamp
output connector pairs on the LDM module back panel.
Finalize all System Wiring
Make a Network Connection:
Connect a 10/100Base-T Ethernet cable to the RJ45
LAN port on the back panel to allow for remote monitoring and control of the
Power System (see the Network Monitoring and Control section for information
on configuring and using the built in Web-GUI, e-mail, and SNMP functions).
Install the provided Parallel Control Cable (ICT-JMP) between the two Share ports
on the rear (figure 8).
Figure 8. Install Parallel Control Cable
Check that all connections
to the power supply are correct and tight; re-install
the plastic bus bar cover(s) using the screws provided.
Connect the AC power source
: De-energise the AC source by switching off its
circuit breaker. Create two power cables using 3 conductor cord rated for the
maximum input current of the unit by stripping and terminating the three wires
in the Line, Neutral, and Ground terminals of the removable AC input connector
provided with the unit (AC line
labeled “L”,
neutral labeled
“N”
and safety ground
to the middle pin).
Plug the AC connectors into the dual AC inputs on the power system back panel,
and tighten the captive retaining screws.
IMPORTANT: Both AC input feeds must
be used.
Wire the source end of the cord to the de-energised AC supply equipped with a
branch rated circuit breaker of 30A or less for 120V, or 15A or less for 240V.
Parallel Control Cable (ICT-JMP)