For instructions, see Verifying a repair (www.ibm.com/support/knowledgecenter/POWER9/p9ei3/
p9ei3_verifyrepair.htm).
Starting and stopping the 5104-22C, 9006-12P, 9006-22C, or 9006-22P
Learn how to start and stop the system to perform a service action or system upgrade.
Starting the 5104-22C, 9006-12P, 9006-22C, or 9006-22P system
To start the system, complete the steps in this procedure.
About this task
Attention: For safety, airflow purposes and thermal performance, the service access cover must
be installed and fully seated before you power on the system.
You can use this procedure to power on the system; or you can use a console and the IPMI tool to power
on the system.
Procedure
1. Before you press the power button, ensure that the power supplies are connected to the system unit
and that the power cables are connected to a power source.
2. Press the power button (7) shown in Figure 76 on page 91.
You may have to press the switch for 0.5 to 3 seconds.
Figure 75. Power switch for 9006-12P
90 Power Systems: Servicing the IBM Power System LC921 (9006-12P)
Содержание Power System LC921 9006-12P
Страница 1: ...Power Systems Servicing the IBM Power System LC921 9006 12P IBM...
Страница 14: ...xiv Power Systems Servicing the IBM Power System LC921 9006 12P...
Страница 20: ...Figure 3 Turning the 2 5 inch tray upside down 6 Power Systems Servicing the IBM Power System LC921 9006 12P...
Страница 23: ...Figure 6 Turning the 2 5 inch tray upside down Removing and replacing parts in the 9006 12P system 9...
Страница 118: ...104 Power Systems Servicing the IBM Power System LC921 9006 12P...
Страница 120: ...106 Power Systems Servicing the IBM Power System LC921 9006 12P...
Страница 131: ......
Страница 132: ...IBM...