Figure 12. Replacing the memory air baffles
What to do next
Prepare the system for operation. For instructions, see “Preparing the 8335-GTC, 8335-GTG, 8335-GTH,
8335-GTW, or 8335-GTX system for operation after you remove and replace internal parts” on page 94.
Installing PCIe adapters in the 8335-GTG, 8335-GTH, or 8335-GTX system
Find information about removing, installing, using, and managing Peripheral Component Interconnect
Express (PCIe) adapters for the system.
Installing this feature is a customer task. You can complete this task yourself, or contact a service
provider to complete the task for you. You might be charged a fee by the service provider for this service.
The features that are listed in Table 2 on page 20 are electromagnetic compatibility (EMC) Class B
features. See the Class B Notices in the Hardware Notices section.
Installing and configuring the 8335-GTX 19
Содержание Power System AC922
Страница 1: ...Power Systems Installing the System and Ordered Parts for the IBM Power System AC922 8335 GTX IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Installing the System and Ordered Parts for the IBM Power System AC922 8335 GTX...
Страница 105: ...or or or or Installing and configuring the 8335 GTX 91...
Страница 121: ...Figure 54 Routing the power cord loop in the cable management arm Installing and configuring the 8335 GTX 107...
Страница 126: ...112 Power Systems Installing the System and Ordered Parts for the IBM Power System AC922 8335 GTX...
Страница 137: ......
Страница 138: ...IBM...