Figure 4. Connecting the water hoses
3. Plug the power cords into the power supplies.
Note: If a plug is covering a port that you need to use on the rear of the system, remove and discard it.
The port covers ensure that you are reminded that you must reset the Administrator password on your
managed system upon initial system IPL.
4. Attach all cables to the rear of the server.
5. Plug the system power cords and the power cords for any other attached devices into the AC power
source.
6. Continue with “Completing server setup” on page 8.
Completing server setup
Learn how to complete server setup.
Before you begin
Note: You might be required to set the thermal mode of the system to a setting other than the default
setting, depending on your system, adapter, and cable type. For details, see ../p9ei3/
®
Power Systems
™
servers use a baseboard management controller (BMC) for system service
management, monitoring, maintenance, and control.
8 Power Systems: Installing the System and Ordered Parts for the IBM Power System AC922 (8335-GTX)
Содержание Power System AC922
Страница 1: ...Power Systems Installing the System and Ordered Parts for the IBM Power System AC922 8335 GTX IBM...
Страница 4: ...iv...
Страница 14: ...xiv Power Systems Installing the System and Ordered Parts for the IBM Power System AC922 8335 GTX...
Страница 105: ...or or or or Installing and configuring the 8335 GTX 91...
Страница 121: ...Figure 54 Routing the power cord loop in the cable management arm Installing and configuring the 8335 GTX 107...
Страница 126: ...112 Power Systems Installing the System and Ordered Parts for the IBM Power System AC922 8335 GTX...
Страница 137: ......
Страница 138: ...IBM...