Service
Processor
Operational
Phases
This
section
provides
a
high-level
flow
of
the
phases
of
the
service
processor.
SP Power Applied
Pre-Standby Phase
Standby Phase SP Menus Available
Bring-Up Phase SMS Menus Available
Run-time Phase Operating System Login Prompt Available
Pre-Standby
Phase
This
phase
is
entered
when
the
server
is
first
connected
to
a
power
source.
This
phase
is
exited
when
the
power-on
self-test
(POST)
and
configuration
tasks
are
completed.
The
pre-standby
phase
components
are:
v
Service
processor
initialization
-
the
service
processor
performs
any
necessary
hardware
and
firmware
initializations.
v
Service
processor
POST
-
the
service
processor
conducts
power-on
self-tests
on
its
work
and
code
areas.
v
Service
processor
unattended
start
mode
checks
-
To
assist
fault
recovery.
If
unattended
start
mode
is
set,
the
service
processor
automatically
reboots
the
server.
The
service
processor
does
not
wait
for
user
input
or
a
power-on
command,
but
moves
through
the
phase
and
into
the
bring-up
phase.
Access
the
system
management
services
(SMS)
menus
or
the
service
processor
menus
to
reset
the
unattended
start
mode.
Standby
Phase
The
standby
phase
can
be
reached
in
either
of
the
following
ways:
v
With
the
server
off
and
power
connected
(the
normal
path),
recognized
by
OK
in
the
LCD
display.
OR
v
With
the
server
on
after
an
operating
system
fault,
recognized
by
an
8-digit
code
in
the
LCD
display.
In
the
standby
phase,
the
service
processor
takes
care
of
some
automatic
duties
and
its
menus
are
available.
The
service
processor
remains
in
the
standby
phase
until
a
power-on
request
is
detected.
410
Service
Guide
Содержание 6H0
Страница 2: ......
Страница 12: ...x Service Guide ...
Страница 16: ...xiv Service Guide ...
Страница 18: ...xvi Service Guide ...
Страница 28: ...R CEC Drawer 5 EIA Units Primary I O Drawer 5 EIA Units 8 Service Guide ...
Страница 29: ...CEC Drawer Front View 1 1 Power On LED Chapter 1 Reference Information 9 ...
Страница 33: ...5 Fan 4 U0 1 F4 6 Fan 3 U0 1 F3 Chapter 1 Reference Information 13 ...
Страница 37: ...5 Fan 4 U0 2 F4 6 Fan 3 U0 2 F3 Chapter 1 Reference Information 17 ...
Страница 77: ...DC Power Cable Routings Chapter 1 Reference Information 57 ...
Страница 88: ...68 Service Guide ...
Страница 94: ...74 Service Guide ...
Страница 182: ...162 Service Guide ...
Страница 444: ...424 Service Guide ...
Страница 468: ...Replacement Replace in reverse order 448 Service Guide ...
Страница 489: ...Chapter 10 Parts Information This chapter contains parts information for the system 469 ...
Страница 490: ...CEC Drawer 1 2 3 4 9 10 12 11 7 8 6 5 14 14 13 15 16 17 18 18 19 20 470 Service Guide ...
Страница 493: ...1 2 3 4 5 6 7 8 9 10 11 Chapter 10 Parts Information 473 ...
Страница 495: ...I O Drawer 1 2 3 4 5 6 7 8 9 10 11 16 17 18 19 20 12 14 13 13 15 21 22 23 24 26 25 27 Chapter 10 Parts Information 475 ...
Страница 497: ...7 8 9 10 6 1 2 3 4 4 5 Chapter 10 Parts Information 477 ...
Страница 510: ...490 Service Guide ...
Страница 522: ...502 Service Guide ...
Страница 546: ...526 Service Guide ...
Страница 552: ...532 Service Guide ...
Страница 559: ......
Страница 560: ... Printed in USA April 2002 SA38 0566 03 ...
Страница 561: ...Spine information RS 6000 Enterprise Server Model H80 Eserver pSeries 660 Models 6H0 and 6H1 Service Guide SA38 0566 03 ...