Page 58
»
Open water supply.
»
Switch on unit and check for leakage after 15-30 min-
utes of operation.
If leakage occurs, switch off power supply and repair the leaks,
following safety instructions for work on live components!
9.13
Checking Cable Screw Connections,
Heater Element Wires
»
Check that all cable screw connections are securely
tightened
»
Ensure that heating element cable is not dammaged.
Warning:
Loose cable connections cause excessive contact
resistance and overheating of contact surfaces.
9.14
Operational Check
»
Start up the unit and operate for a few minutes, ideally
at maximum output..
»
Check safety devices.
»
Check hose connections for possible leaks.
9.15
Dismantling
Once the steam humidifier will no longer be used, dismantle
(demolish or scrap) it by following the installation procedures in
reverse order.
Warning:
Dismantling of the unit may only be performed by
qualified personnel. Electrical dismantling may only be per-
formed by trained electricians.
Obey the safety guidelines in section “Safety Instructions,” espe-
cially the guidelines for disposal.
Содержание HeaterLine HL 12
Страница 1: ...Electric Heater Steam Humidifier HL CSAK HL CSA IMPORTANT READ AND SAVE THESE INSTRUCTIONS Manual...
Страница 28: ...Page 28 Drill Pattern DN40 1 1 2 not to scale Note Due to variable print media the dimensions are not to scale...
Страница 67: ...Page 67 13 Exploded View...
Страница 68: ...Page 68 14 View of Cabinet...