Page 30
Installation type 2
If the steam manifold is positioned lower than 500mm/
19.7inch above the steam humidifier:
»
Lay steam hose at a height of at least 400mm/15.7inch
above unit and then connect to the steam manifold with
a constant fall.
»
Lay condensate hose with a loop of 200mm/7.9inch
diameter (vapour trap) to the drain. The distance bet-
ween vapour trap and steam manifold should have at
least 500mm/19.7inch.
»
Lay the loop of condensate hose 200mm/7.9inch
directly above the drain.
Содержание HeaterLine HL 12
Страница 1: ...Electric Heater Steam Humidifier HL CSAK HL CSA IMPORTANT READ AND SAVE THESE INSTRUCTIONS Manual...
Страница 28: ...Page 28 Drill Pattern DN40 1 1 2 not to scale Note Due to variable print media the dimensions are not to scale...
Страница 67: ...Page 67 13 Exploded View...
Страница 68: ...Page 68 14 View of Cabinet...