![Hygood FM-200 Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/hygood/fm-200/fm-200_installation-manual_2192834062.webp)
Slave Actuation Pilot Line
For slave containers the pneumatic connection is made
using flexible pilot hoses�� To fit the pilot hoses, remove
the 1/4
”
pilot pressure port plug from the master container
valve assembly and install the 1/4
”
male adaptor (Part No��
309��013��005) for the 25 mm (1
”
)
and 50 mm (2
”
)
valves,
and a 1/4
”
NPT street elbow and male adaptor for the 80
mm (3
”
)
valve��
Install the pilot line tee, Part No�� 309��013��003 on to all
pneumatic actuators (wrench tight)�� Connect one end of
the pilot hose Part No�� 306��205��003 to the adaptor on the
master container and one end to the pilot line tee on the
pneumatic actuator�� Connect a pilot hose between pilot
line tees on all pneumatic actuators (see Figure 62)��
The maximum number of slave actuated containers is 9
(10 containers system in total)�� After every 10 containers
another master container must be created, using either an
electrical actuator or pneumatically by removing the 1/4
”
pilot pressure port plug on the tenth container, installing
the 1/4
”
male adaptor (Part No�� 309��013��005) and another
pilot hose (Part No�� 306��205��003) and tee (Part No��
309��013��003) into the pneumatic actuation line�� All the
electrical actuators must operate simultaneously to ensure
the correct discharge time��
Figure 2 - Multiple Container Actuation
2
SECTION 5 - INSTALLATION
FM-200® (UL/FM)
14A-07H
02
2010-03
Содержание FM-200
Страница 100: ...100 APPENDIX C FM 200 DATA SHEET FM 200 Material Safety Data Sheet MSDS 5 PAGES FM 200 UL FM 14A 07H 02 2010 03...
Страница 102: ...3ULQW DWH 102 APPENDIX C FM 200 DATA SHEET FM 200 UL FM 14A 07H 02 2010 03...
Страница 104: ...3ULQW DWH 104 APPENDIX C FM 200 DATA SHEET FM 200 UL FM 14A 07H 02 2010 03...