18.4.41 Assembling the countershaft
Info
Use new lock rings with every repair.
Preparatory work
- Carefully lubricate all parts before assembling.
- Check the transmission. (
0
p. 224)
Main work
305012-11
- Secure the countershaft in the bench vise with the toothed end facing downward.
Guideline
I Use soft jaws.
- Mount needle bearing
O.
- Mount second-gear idler gear
8.
- Mount stop disk
(D
and lock ring
C,.
- Mount fifth-gear sliding gear
0
with the shift groove facing up.
- Mount lock ring
(D
and stop disk@.
- Mount needle bearing @).
- Mount fourth-gear idler gear
@).
- Mount needle bearing Gi).
- Mount third-gear idler gear
m.
- Mount lock ring
48
and stop disk G).
- Mount sixth-gear sliding gear
4D
with the shift groove facing downward.
- Mount stop disk
e.
- Mount needle bearing
41!).
- Mount first-gear idler gear
49.
- Mount stop disk
41!).
- Finally, check all the gear wheels for smooth operation.
18 ENGINE
227
Содержание F2203P4
Страница 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2016 FE 350 FE 350 S Art no 3403027en Husqvarna MOTORCYCLES ...
Страница 2: ......
Страница 93: ...Finishing work Install the main silencer ilill p 87 Install the right side cover l li p 96 10 EXHAUST 91 ...
Страница 293: ...29 SERVICE SCHEDULE 291 ...
Страница 321: ...Components A11 EFI control unit B32 Fuel level sensor F1 Fuse P13 Speedometer 30 WIRING DIAGRAM 319 ...
Страница 333: ...Components A11 EFI control unit B32 Fuel level sensor F1 Fuse P13 Speedometer 30 WIRING DIAGRAM 331 ...
Страница 349: ...Components A11 EFI control unit B32 Fuel level sensor F1 Fuse P13 Speedometer 30 WIRING DIAGRAM 347 ...