Alarm
ID
Alarm Name Alarm
Severity
Alarm
Sub-ID
Cause
Suggestions
Major
5
In the remote
reactive
power
scheduling
mode, the
SmartLogger
cannot
receive the
reactive
power
scheduling
command, or
the received
reactive
power
scheduling
command is
abnormal.
1. Check whether the
communication network
between the SmartLogger
and the plant scheduling
control system is normal.
2. Check whether the reactive
power scheduling commands
received by the SmartLogger
from the plant scheduling
control system are correct,
such as the command format
and protocol type.
1103
General
Circuit
Breaker
Disconnected
Major
1
The general
circuit
breaker at
the grid
connection
point is
disconnected.
Check whether the disconnection
is a normal. If it is abnormal,
contact service engineers to
reconnect the circuit breaker.
1104
Abnormal
Cubicle
Major
1
The Cubicle
device has
detected an
exception at
the grid
connection
point.
When the Cubicle alarm is
enabled, check whether the DI
signal received by the
SmartLogger is consistent with
the dry contact status. If yes,
restart the solar inverter.
1105
Device
Address
Conflict
Major
1
The
communicati
on address of
the the
current device
conflicts with
that of the
device to be
connected.
Change the local address or the
address of the device to be
connected.