
Parameter
Description
Start time
If the device needs to run with specified maximum
power in certain periods of a day, add setting records
based on site requirements.
When multiple time points are set, the device will run
with the maximum power specified for the time point
that is earlier than and the closest to the current
system time. For example, if you add 00:00:00 and
12:00:00 on the WebUI and the current system current
is 14:30:00, the device will run with the maximum
power specified for 12:00:00.
Percentage(%)
Remote Communication Scheduling
The management system or independent power adjustment device sends
scheduling commands over the communications port that works with Modbus-TCP,
GOOSE, or IEC104, without the need of user configuration or operation. The
SmartLogger can automatically switch between scheduling modes and send
scheduling commands.
Parameter
Description
Active power control
mode
Set this parameter to Remote communication
scheduling.
The SmartLogger parses the scheduling command
delivered by the upper-layer management system to
valid instruction data that can be identified by the
devices in the PV plant and delivers the data to all
devices connected to the SmartLogger.
As the Remote communication scheduling mode has
a higher priority, the SmartLogger automatically
changes Active power control mode to Remote
communication scheduling after receiving a
scheduling command from the upper-layer
management system.
SmartLogger3000
User Manual
6 WebUI Operations
Issue 10 (2022-08-20)
Copyright © Huawei Technologies Co., Ltd.
202