Figure 3-10 Upflow needle valve
(1) Exhaust valve
(2) Drainage valve
Figure 3-11 Downflow needle valve
(1) Exhaust valve
(2) Drainage valve
----End
Follow-up Procedure
●
Remove the desiccant bag under the heat exchanger of the upflow unit.
●
Remove the fan maintenance baffle plate of the downflow unit, and take out
the desiccant bag inside the cabinet.
NetCol8000-C(070, 130, 190) In-room Chilled Water
Smart Cooling Product
User Manual
3 Installation
Issue 07 (2021-12-30)
Copyright © Huawei Technologies Co., Ltd.
44