Check Item
Expected Result
Actual Result
Pipes
Pipes are secured and not damaged.
□ Passed □ Failed
The needle valve cap has been
tightened.
Lay out the pipes properly, and cannot
destroy the building structure and
waterproof.
Electric
verification
No cable is in contact with the copper
pipe.
□ Passed □ Failed
Verify that the cables have been used
protective casing and the cable outlet
facing down.
Verify that the terminal position is
higher than the position of the
connecting cable.
Verify that the phase sequence of the
outdoor unit output cables is correct. If
the phase sequence is incorrect, the
outdoor fan will rotate reversely.
Waterproof connectors are tightened.
Apply sealing putty when the
waterproof connector on the outdoor
unit side faces upward.
Low
temperature
component
(optional)
Cables are securely tightened, and
measures have been taken to prevent
cables from sun exposure and water.
□ Passed □ Failed
The low temperature component is
secured using bolts.
5.3 Checking the Water Cooling Module
Table 5-5 Installation checklist
Check Item
Expected Result
Actual Result
Rack
The rack is installed properly,
without any tilt.
□ Passed □ Failed
Pipes
Ports are connected correctly, and
all pipes are wrapped with thermal
insulation foam
□ Passed □ Failed
NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual
5 Installation Verification
Issue 08 (2021-09-17)
Copyright © Huawei Technologies Co., Ltd.
119