10 Cable Layout
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
220
Wiring Terminal in the ALM_IN Port
Core Wire in the Cord End Terminal
G
Core wire 8 (brown)
+
Core wire 7 (brown-white)
-
Core wire 6 (green)
If connected to an ECC, the monitoring cable should be connected by performing the
following steps.
a.
Connect one end of the network cable to the Ethernet port on the water detector.
b.
Connect the other end of the network cable to the AI/DI port on the ECC collector.
----End
10.12.17 Connecting Cables to the SJ535A Water Sensor
Prerequisites
A monitoring cable required has been prepared.
You are familiar with the functions of all ports on the CCU collector by referring to
10.12.2 Port Description for the CCU Collector
You are familiar with the functions of all ports on the ECC collector by referring to
10.12.3 Port Description for the ECC Collector
Context
When connecting the water sensor and the CCU collector, you need to perform the following
steps to prepare a special monitoring cable.
Procedure
Step 1
Remove the rear cover from the water sensor to expose the interior panel, as shown in