IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
10 Cable Layout
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
167
Figure 10-20
Signal cable routes in the NetEco scenario
NetEsy Scenario
shows signal cable routes in the NetEsy scenario.
Figure 10-21
Signal cable routes in the NetEsy scenario
10.10 Installing Cables for the Power Supply and
Distribution System
10.10.1 Connecting Cables to Battery Cabinets
The IDS2000-M has 16 battery cabinet configurations.