IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
10 Cable Layout
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
170
Figure 10-25
Connecting cables to a busbar
Configuration 1
Configuration 1 applies to the scenario where the actual total power is greater than 36 kW but
no greater than 48 kW, and the backup time is 15 minutes. The following table describes
battery cabinet configuration.
Table 10-2
Battery cabinet configuration 1
Component
Configuration
Configuration Number
Battery
Rechargeable Battery 480
V-65 Ah Battery
A string of 40 batteries
Battery tray
Battery tray for 4 batteries
10 PCS
Circuit breaker
Circuit breaker,
Pyromagnetic Breaker, 380
V AC/500 V DC, 160 A, 4P,
36 kA, 102 (W)*70 (D)*130
(H)
1 PCS
Battery cable
Battery Accessory, SD-480
V 65 Ah/12 V-PX-25 (ET),
Cables for battery group
SHOTO 6-GFM-65
embedded in battery cabinet
of IDC (25 mm
2
), IDC
special
1 PCS