IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
8 (Optional) Installing the Lighting System
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
121
Figure 8-2
Connecting LED lights
Procedure
Step 1
Secure the LED light holder to the top of the skylight connective plate using M3 screws, as
shown in
The M3 screws are factory-installed on the skylight connective plate. Remove the screws from the
skylight connective plate before installing the LED light holder.
Ensure that each LED light is secured by two holders.