3 Installation Scenarios in Dual Row Aisle Containment
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
38
Figure 3-9
Securing adjacent skylight connective plates
3.
Install the other skylight connective plates in sequence using the same method.
Keep the gaps between skylight and skylight connective plates at 3±1 mm.
Step 4
Secure the magnetic lock to its fastener using an M6 screw, as shown in
Figure 3-10
Installing a magnetic lock
Step 5
Install control skylights, as shown in
1.
Install the monitoring components, and connect the cables to the ports. For details about
the installation of the monitoring components, see
9.1.6 Installing and Connecting
2.
Lift the control skylight (with the monitoring components installed) to the top of the aisle,
and face the rubber plug of the cable hole away from the aisle, as shown in
Secure the skylight to the skylight connective plates using M4 screws, as shown in