IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
10 Cable Layout
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
238
Type of the Collector
Connected
Wiring Terminal in the
RS485 Port
Color of Core Wire in the
Cord End Terminal
ECC collector
+
Orange and white
-
Orange
Step 2
Connect the RJ45 connector of the RS485 monitoring cable to the RS485 port on the CCU
collector or ECC collector.
----End
10.12.31 Connecting a Monitoring Cable to a NetCol5000-C030
Prerequisites
A network cable used for monitoring has been prepared.
You are familiar with the functions of all ports on the CCU collector by referring to
10.12.2 Port Description for the CCU Collector
You are familiar with the functions of all ports on the ECC collector by referring to
10.12.3 Port Description for the ECC Collector
Procedure
Step 1
Connect one end of the network cable to J73 communications port 1 or 2 on the
NetCol5000-C030 main control board, and flip toggle switches
3
and
4
of DIP switch S1 to
ON
.
Figure 10-69
NetCol5000-C030 main control board
(1) Teamwork communication & Monitoring communication port J73
(2) DIP switch S1