6 General post-installation checks
120
HSD S.p.A. © - h0105k01a.fm120718
6.1.4
Electrical connections
The electrospindle earthing (see paragraph
5.8 “Electrical connections”
) must be
connected to the machine earthing.
The thermal alarm must activate a procedure that protects the electrospindle coils
from overheating (see paragraph
7.8.5 “Use and technical characteristics of the
thermal alarm”
).
6.1.5
Programming the inverter
Make sure the specifications in paragraph
5.7 “Fluid distributor connections”
are complied with.
6.2 Start-up checks
Only start up the electrospindle with the
“Tool-holder cone correctly locked”
(see
page
140
).
For HSK versions only: the electrospindle must not be started without the tool-holder
inserted.
Tool-holder cone ejection must proceed as specified in section
7.4 “Tool-holder locking and
ejection device”
.
The control sensors must intervene according to the logic described in paragraph
7.8.3 “Electrospindle conditions and corresponding outputs of the inductive sensors”
.
The tool change cycle must only take place with the shaft stopped.
Check the correct operation of the cooling system.
With the tool holder inserted and without performing machining operations, perform the
preheating cycle described in paragraph
7.3 “Warm-up”
.
Содержание ES779
Страница 2: ......
Страница 4: ...Information about the publication 4 HSD S p A H5801H0118 fm120718 ...
Страница 12: ...Table of contents 12 HSD S p A H5801H0118TOC fm120718 ...
Страница 13: ...Preliminaries ...
Страница 14: ......
Страница 27: ...Descriptions ...
Страница 28: ......
Страница 88: ...3 Technical specifications and main parts 88 HSD S p A h0102k01a fm120718 ...
Страница 121: ...Adjustment and Maintenance ...
Страница 122: ......
Страница 186: ...9 Replacing components 186 HSD S p A h0108k01a fm120718 ...
Страница 187: ...Appendices ...
Страница 188: ......
Страница 196: ...C Disposal 196 HSD S p A h0109k00a fm120718 ...
Страница 199: ......