Diagnostics
43
Edge Switch 2/12 Service Manual
MAP 0100: Power Distribution Analysis
This MAP describes fault isolation for the switch power distribution system,
including a defective AC power cord or power supply.
1
Is fault isolation being performed at the switch?
YES
NO
↓
Fault isolation is being performed at the EWS interface. Go to
step 8
.
2
Verify the switch is connected to facility power and is powered on.
1. Ensure the AC power cord is connected to the rear of the switch and a facility
power receptacle. If not, connect the cord as directed by the customer.
2. Ensure the associated facility circuit breaker is on. If not, ask the customer to
set the circuit breaker on.
3. Ensure the AC power cord is not damaged. If damaged, replace the cord.
Was a corrective action performed?
YES
NO
↓
Go to
step 4
.
3
Verify power supply and switch operation. Inspect the switch for indications of
being powered on, such as:
■
At the front bezel, an illuminated PWR LED (green) or ERR LED (amber).
■
Illuminated LEDs adjacent to Fibre Channel ports.
■
Audio emanations and airflow from cooling fans.
Is a power supply or power distribution system failure indicated?
YES
NO
↓
The switch appears operational. Exit MAP.
Содержание StorageWorks Edge Switch 2/12
Страница 16: ...About this Guide 16 Edge Switch 2 12 Service Manual ...
Страница 124: ...Repair Information 124 Edge Switch 2 12 Service Manual ...
Страница 132: ...Illustrated Parts Breakdown 132 Edge Switch 2 12 Service Manual ...
Страница 172: ...Event Codes 172 Edge Switch 2 12 Service Manual ...