Yes
8
8M
50
No
7
4M
25
No
7
4M
20
No
6
2M
15
No
6
2M
10
No
5
1M
5
No
4
512K
2.5
No
2
128K
1 or less
Configuring an FCIP route
Step 1. Verify your system requirements
Verify that you have the following for both the local site and the remote site (see
Figure 65
on page 113):
•
HP StorageWorks MPX200 Multifunction Router 1–GbE Base Chassis or HP StorageWorks MPX200
Multifunction Router 10–1 GbE Base Chassis. Note that FCIP is currently supported only on MPX200
1 GbE ports.
•
HP Storage Works MPX200 Half Chassis FCIP License
•
Continuous Access EVA
•
EVA3000/5000 or EVA4x00/6x00/8x00 storage system
•
FC fabrics consisting of B-series or C-series switches
•
Cat 5e network cable, three per site (mgmt, (2) FCIP)
•
Optical small form-factor pluggable (SFP) transceiver and FC cable, two per site
•
MPX200 serial console cable adapter, Cat 5e network cable
Additional equipment for the local site and remote site (see
Figure 71
on page 118 and
Figure
73
, page 118) is as follows:
•
HP StorageWorks MPX200 Multifunction Router 1–GbE Upgrade Blade (MPX200 blade for re-
dundancy)
• Or HP StorageWorks MPX200 Multifunction Router 10–1 GbE Upgrade Blade. Note that FCIP
is currently supported only on MPX200 1 GbE ports.
• HP Storage Works MPX200 Full Chassis FCIP License
NOTE:
For the latest information about operating system and multipath software support, see SPOCK at the
website
http://www.hp.com/storage/spock
. You must sign up for an HP Passport to enable access.
Step 2. Pre-installation checklist
Before you begin the configuration process, contact your system administrator for the following
information for both sites:
MPX200 Multifunction Router
133
Содержание Storageworks 8100 - enterprise virtual array
Страница 20: ...20 ...
Страница 30: ...MPX200 Multifunction Router overview 30 ...
Страница 47: ...Figure 27 iSCSI controller options Remove controller MPX200 Multifunction Router 47 ...
Страница 48: ...Managing the MPX200 using HP Command View EVA 48 ...
Страница 59: ...Figure 32 Virtual disk properties Figure 33 Host details MPX200 Multifunction Router 59 ...
Страница 112: ...MPX200 iSCSI configuration rules and guidelines 112 ...
Страница 219: ...Load Balancing Enabled Array License Not Applied MPX200 Multifunction Router 219 ...
Страница 222: ...Controller Id WWPN PortId Path Status 0 20 78 00 c0 ff d5 92 e5 02 04 00 Current Optimized Offline Data Migration 222 ...
Страница 248: ...Offline Data Migration 248 ...
Страница 258: ...Diagnostics and troubleshooting 258 ...
Страница 306: ...Command referencecommand reference 306 ...
Страница 330: ... Blade number 1 or 2 Simple Network Management Protocol setup 330 ...
Страница 368: ...Saving and restoring the MPX200 configuration 368 ...
Страница 402: ...Data migration best practices 402 ...
Страница 408: ...408 ...