Contents
Blade Element (rx2800 i4) ............................................................................................................10
Versatile I/O (VIO) Enclosure .......................................................................................................10
CLuster I/O Modules (CLIMs) .......................................................................................................11
IP CLIM and Telco CLIM (Optional).........................................................................................12
Storage CLIM...........................................................................................................................15
2 Identifying NS2300 System Components..........................................................20
Terminology...................................................................................................................................20
Rack and Offset Physical Location ...............................................................................................21
Blade Element Group-Module-Slot Numbering ............................................................................21
VIO Enclosure Group-Module-Slot Numbering ............................................................................24
CLIM Connection Group-Module-Slot-Port Numbering ................................................................25
3 Site Preparation Guidelines for NS2300 Systems.............................................26
Cooling and Humidity Control.............................................................................................................27
Weight.................................................................................................................................................27
Flooring...............................................................................................................................................28
Dust and Pollution Control..................................................................................................................28
Zinc Particulates.................................................................................................................................28
Space for Receiving and Unpacking the NS2300 System.................................................................28
Operational Space for an NS2300 System.........................................................................................29
4 System Installation Specifications for NS2300 Systems...................................30
Contents
3
Содержание Integrity NonStop i NS2300
Страница 5: ...Ukraine RoHS material content declaration 79 Index 80 Contents 5 ...
Страница 9: ...Figure 1 Example NS2300 System Configuration 42U 9 ...
Страница 31: ...Figure 3 Intelligent PDU Connections Without UPS Power Distribution for NS2300 Systems 31 ...
Страница 33: ...Figure 5 Intelligent PDU Connections With Three Phase UPS Power Distribution for NS2300 Systems 33 ...
Страница 35: ...Figure 7 Modular PDU Connections With Single Phase UPS Power Distribution for NS2300 Systems 35 ...
Страница 36: ...Figure 8 Modular PDU Connections With Three Phase UPS 36 System Installation Specifications for NS2300 Systems ...
Страница 38: ...Figure 9 Example of Bottom AC Power Feed Without UPS 38 System Installation Specifications for NS2300 Systems ...
Страница 39: ...Figure 10 Example of Top AC Power Feed Without UPS Power Distribution for NS2300 Systems 39 ...
Страница 41: ...Figure 12 Example of Bottom AC Power Feed With Single Phase UPS Power Distribution for NS2300 Systems 41 ...