Technical Document for NS2300 Systems
Each new NS2300 includes a detailed Technical Document that serves as the connection map
for the system and which describes:
•
Rack included with the system and each enclosure installed in the rack
•
Rack U location at the bottom edge of each enclosure
•
Each cable with source, destination, connector type, cable part number, and connection
labels
TIP:
It is important to retain all NS2300 system records in an Installation Document Packet,
including the Technical Document for your system and any configurations forms. To add CLIM
configuration forms to your Installation Document Packet, have your service provider copy the
forms from the
CLuster I/O Module (CLIM) Installation and Configuration Manual
and the
Versatile
I/O Manual
(for IP or Telco CLIM-related configurations).
NS2300 Standard and Optional Hardware
•
“Blade Element (rx2800 i4) ” (page 10)
•
“Versatile I/O (VIO) Enclosure ” (page 10)
•
“CLuster I/O Modules (CLIMs) ” (page 11)
•
“SAS Disk Enclosure” (page 16)
•
“Maintenance Switch” (page 18)
•
•
“UPS and ERM (Optional)” (page 18)
•
“Enterprise Storage System — ESS (Optional)” (page 19)
Blade Element (rx2800 i4)
The rx2800 i4 server is adapted for use as an AC-powered blade element in the NS2300 system.
Each blade element contains an Intel® Itanium® processor with one core enabled and a ServerNet
PCI adapter card to provide connectivity to the ServerNet fabrics.
NOTE:
NS2300 blade elements cannot be mixed with NS2400 blade elements in the same
system.
For details about the rx2800 i4 server, see the
HPE Integrity rx2800 i4 Server User Service Guide
at:
http://h20566.www2.hpe.com/portal/site/hpsc/public/psi/manualsResults/?
sp4ts.oid=5330448
Versatile I/O (VIO) Enclosure
Two VIO enclosures, one required for each ServerNet fabric, provide Gigabit Ethernet networking
and I/O connectivity as shown in
For more information on VIO enclosure connections, have your service provider refer to the
, the
Versatile I/O Manual, and the NonStop Hardware NS2100 and NS2300
Hardware Installation Manual
.
10
NS2300 System Overview
Содержание Integrity NonStop i NS2300
Страница 5: ...Ukraine RoHS material content declaration 79 Index 80 Contents 5 ...
Страница 9: ...Figure 1 Example NS2300 System Configuration 42U 9 ...
Страница 31: ...Figure 3 Intelligent PDU Connections Without UPS Power Distribution for NS2300 Systems 31 ...
Страница 33: ...Figure 5 Intelligent PDU Connections With Three Phase UPS Power Distribution for NS2300 Systems 33 ...
Страница 35: ...Figure 7 Modular PDU Connections With Single Phase UPS Power Distribution for NS2300 Systems 35 ...
Страница 36: ...Figure 8 Modular PDU Connections With Three Phase UPS 36 System Installation Specifications for NS2300 Systems ...
Страница 38: ...Figure 9 Example of Bottom AC Power Feed Without UPS 38 System Installation Specifications for NS2300 Systems ...
Страница 39: ...Figure 10 Example of Top AC Power Feed Without UPS Power Distribution for NS2300 Systems 39 ...
Страница 41: ...Figure 12 Example of Bottom AC Power Feed With Single Phase UPS Power Distribution for NS2300 Systems 41 ...