Operational Space for an NS2300 System
Ensure:
√
NS2300 system site layout, uses the equipment dimensions, door swing, and service clearances listed in
“Dimensions and Weights” (page 49)
and takes advantage of existing lighting and electrical outlets.
Airflow direction and current or future air conditioning ducts are not obstructed. Eliminate any obstructions to
equipment intake or exhaust air flow. Refer to
“Cooling and Humidity Control” (page 27)
.
Adequate space planning to allow for future equipment.
Site layout plan includes provisions for things such as channels or fixtures used for cable routing, cables, patch
panels, and storage areas.
Operational Space for an NS2300 System
29
Содержание Integrity NonStop i NS2300
Страница 5: ...Ukraine RoHS material content declaration 79 Index 80 Contents 5 ...
Страница 9: ...Figure 1 Example NS2300 System Configuration 42U 9 ...
Страница 31: ...Figure 3 Intelligent PDU Connections Without UPS Power Distribution for NS2300 Systems 31 ...
Страница 33: ...Figure 5 Intelligent PDU Connections With Three Phase UPS Power Distribution for NS2300 Systems 33 ...
Страница 35: ...Figure 7 Modular PDU Connections With Single Phase UPS Power Distribution for NS2300 Systems 35 ...
Страница 36: ...Figure 8 Modular PDU Connections With Three Phase UPS 36 System Installation Specifications for NS2300 Systems ...
Страница 38: ...Figure 9 Example of Bottom AC Power Feed Without UPS 38 System Installation Specifications for NS2300 Systems ...
Страница 39: ...Figure 10 Example of Top AC Power Feed Without UPS Power Distribution for NS2300 Systems 39 ...
Страница 41: ...Figure 12 Example of Bottom AC Power Feed With Single Phase UPS Power Distribution for NS2300 Systems 41 ...