Hardware options installation 53
8.
Install the NVDIMM.
9.
Install the HPE Smart Storage Battery.
10.
Install the air baffle.
11.
Install the access panel (on page
12.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack.
13.
Connect each power cord to the server.
14.
Connect each power cord to the power source.
15.
Power up the server ("
16.
Sanitize the NVDIMM-Ns, if required. For more information, see the HPE 8GB NVDIMM User Guide
on the Hewlett Packard Enterprise Information Library (
http://www.hpe.com/info/NVDIMM-docs
Drive options
Depending on the configuration, this server supports SAS, SATA, and NVMe drives. For more
information on drive support, see "Device bay numbering ("
When adding hard drives to the server, observe the following general guidelines:
•
The system automatically sets all device numbers.
•
If only one hard drive is used, install it in the bay with the lowest device number.
•
Drives should be the same capacity to provide the greatest storage space efficiency when drives are
grouped together into the same drive array.
Содержание BCDVideo BCD108
Страница 71: ...Hardware options installation 71 7 Install the GPU support bracket 8 Install the riser cage ...
Страница 92: ...Hardware options installation 92 o Primary PCI riser cage o Secondary PCI riser cage ...
Страница 96: ...Hardware options installation 96 3 Remove the hot plug fan or fan blank from fan bay 1 ...
Страница 152: ...Support and other resources 152 ...
Страница 153: ...Support and other resources 153 ...