![horsch Maestro 12.45 CV Скачать руководство пользователя страница 134](http://html1.mh-extra.com/html/horsch/maestro-12-45-cv/maestro-12-45-cv_operating-instructions-manual_2164095134.webp)
Maintenance location
Work instructions
Interval
Coulter discs (seed and fertiliser discs)
Check state, wear, bearing play and light movement. At the
front the discs should be slightly tensioned against each
other
40 h
Check the wear on the coulter discs, if necessary, move the
trap rollers down by one bore.
Scrapers (seed and fertiliser discs)
Check wear and fastening
40 h
Depth guide wheels and press rollers
Check state, wear, bearing play and light movement
daily
Depth guide wheels
Check the effect on scrapers on the coulter discs
40 h
Check contact of inner running face on the coulter discs.
Adjust as required.
Trap roller
Check for damage and free rotation
daily
Set the depth setting to the depth of the coulter discs
Clearing stars
Check state, wear, bearing play and light movement. Check
the depth setting
daily
Pneumatic system
Fan
Check for leaks, function, speed setting
daily
Fan, seed hoses and fall sluice
Leaks, crushing and chafing points, blockage
daily
Protective fan grid
Clean from contamination
daily
Impeller wheel
Check condition and fastening, clean of dirt deposits
daily
Retighten the drive flange (for the first time after 50 hrs.)
Leak oil return flow
Return flow pressure max. 5 bar
daily
Hopper with distributor
Check for leak tightness, blockage, clean the distributor
daily
Frame (vacuum distribution)
Open cleaning flaps and clean inside of frame
daily
PTO-shaft pump fan
Replace return filter (workshop work)
yearly
See chapter
Pneumatics – drive with PTO-shaft pump
PTO-shaft pump
Oil change – every 2,000 h / every 2 years, whichever comes
earlier (workshop work)
Metering unit for micro-granular compound
Hopper, distributor and metering unit
Remove residues and clean
daily
Distributor tower for micro-granular
compound
Check distributor and hoses for damage and blockage,
clean the distributor
daily
Fertiliser metering unit
Roller and sealing lip
Check state, setting and wear - replace the sealing lip at
least once per year.
daily
Rotor
Check for sticking cells, clean
daily
Motor bearing and housing cover
Check for condition and smooth running
before
Insert
Single grain metering unit with downpipe
Vacuum connection
Check for fastening and leak tightness
40 h
Transition to downpipe
Check the seat of the covering (rubber flap).
40 h
Downpipe
Check state and fastening at the pipe inlet.
daily
Check pipe discharge for stuck material and damages
Clean downpipe with grain sensor. In case of strong
contamination clean several times per day.
Single grain metering unit
Clean and remove deposits
daily
130
Содержание Maestro 12.45 CV
Страница 2: ......
Страница 5: ......
Страница 27: ...Maestro 8 CV 5470 665 3900 6500 3000 5900 8 70 CV 6360 8 75 CV 6570 8 80 CV 6790 23...
Страница 28: ...5470 6500 3900 615 3000 Maestro 9 CV 6700 9 70 CV 7590 9 75 CV 7160 9 80 CV 7590 24...
Страница 29: ...Maestro 12 CV 5550 6500 665 3900 3000 6790 5900 25...
Страница 121: ...6 km h 8 km h 10 km h 12 km h 14 km h 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 kg ha Metering auger 66 cm 117...
Страница 145: ...WARNING Never park the machine unsecured with the axle dismantled 141...
Страница 154: ......