
3 Operations
30
3.4.2 Measurement operation
Operating procedure
1.
Check that the MEASUREMENT screen is displayed.
Fig. 29 MEASUREMENT screen
2.
Introduce the sample gas and reference gas from the analyzer inlet at the specified
flow rate (7 L/min) while checking the flowmeter.
It takes approximately 3 minutes for the indications to appear after introduction.
6 Check
boxes
Selecting the check box on the right side of a component
name displays a graph of the measurement values for
that component.
―
No.
Name
Description
Reference
Содержание GA-370
Страница 1: ...Trace Gas Monitor GA 370 Instruction Manual eng CODE GZ0000456936B...
Страница 91: ...8 Reference 75 8 5 Related diagrams Name No GA 370 External Dimensions GZ0000471868B Flow Sheet GZ0000465573...
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ...2 Miyanohigashi Kisshoin Minami ku Kyoto 601 8510 Japan http www horiba com...