
3 Operations
20
3.3.2 Calibration preparations
Gas connection check
Check that the calibration gas to be used for calibration is connected correctly.
Use a cylinder with a concentration of approximately 90% of the calibration range for span
gas.
Check the residual pressure of the span gas cylinder, and replace the cylinder with a new
one if it is approximately 1 MPa or less.
Calibration range settings
Set the range to use for calibration.
Operating procedure
1.
Press the [CALIBRATION RANGE] button in the CALIBRATION MENU screen.
The CALIBRATION RANGE screen appears.
2.
Press the range button of the component to be calibrated.
Fig. 14 CALIBRATION RANGE screen
3.
Select the value to set and then press the [OK] button.
The setting is updated and the CALIBRATION RANGE screen reappears.
Fig. 15 Calibration range selection screen
Содержание GA-370
Страница 1: ...Trace Gas Monitor GA 370 Instruction Manual eng CODE GZ0000456936B...
Страница 91: ...8 Reference 75 8 5 Related diagrams Name No GA 370 External Dimensions GZ0000471868B Flow Sheet GZ0000465573...
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ...2 Miyanohigashi Kisshoin Minami ku Kyoto 601 8510 Japan http www horiba com...