
3 Operations
17
3.3
Calibration
Stop the gas flow and perform calibration from the span gas.
Pressing the menu button (icon figure) in the MEASUREMENT screen displays the
CALIBRATION MENU screen. The settings for calibration operation and calibration are
configured from the CALIBRATION MENU screen.
Fig. 12 CALIBRATION MENU screen
Note
In order to obtain stable and accurate data, perform periodic regular calibration.
Calibration flow
The following shows the calibration flow.
Calibration
range settings
Span gas
concentration settings
Zero calibration
Span calibration
Содержание GA-370
Страница 1: ...Trace Gas Monitor GA 370 Instruction Manual eng CODE GZ0000456936B...
Страница 91: ...8 Reference 75 8 5 Related diagrams Name No GA 370 External Dimensions GZ0000471868B Flow Sheet GZ0000465573...
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ...2 Miyanohigashi Kisshoin Minami ku Kyoto 601 8510 Japan http www horiba com...