P
OWER
CABLING
Honeywell
• 26
4
4.2
Cable installation
•
Before starting, check that none of the components of the drive is live. Read carefully
the warnings in chapter 1.
•
Place the motor cables sufficiently far from other cables
•
Avoid placing the motor cables in long parallel lines with other cables.
•
If the motor cables run in parallel with other cables note the minimum distances
between the motor cables and other cables given in table below.
•
The given distances also apply between the motor cables and signal cables of other
systems.
•
The maximum lengths of motor cables (shielded) are 100 m (MR4), 150 m (MR5 and
MR6) and 200 m (MR7 to MR9).
•
The motor cables should cross other cables at an angle of 90 degrees.
•
If cable insulation checks are needed, see chapter Cable and motor insulation checks.
Start the cable installation according to the instructions below:
Distance
between cables,
[m]
Shielded
cable, [m]
0.3
50
1.0
200
Содержание SmartDrive HVAC
Страница 44: ...POWER CABLING Honeywell 42 4 Figure 39 ...
Страница 68: ...COMMISSIONING Honeywell 66 6 ...