Honeywell
• 0
INDEX
Document: DPD00487D
Version release date: 10.6.11
2.2.1 Lifting frames MR8 and MR9 .......................................................................................... 8
2.3
2.3.1 Size MR4 ...................................................................................................................... 10
2.3.2 Size MR5 ...................................................................................................................... 10
2.3.3 Size MR6 ...................................................................................................................... 11
2.3.4 Size MR7 ...................................................................................................................... 11
2.3.5 Size MR8 ...................................................................................................................... 12
2.3.6 Size MR9 ...................................................................................................................... 12
2.4
4.1.1 Cable dimensioning and selection ................................................................................ 21
4.2
4.2.1 Frames MR4 to MR7..................................................................................................... 27
4.2.2 Frames MR8 and MR9.................................................................................................. 33
4.3
5.1.1 Control cable sizing....................................................................................................... 45
5.1.2 Control terminals and DIP switches .............................................................................. 46
5.2
5.2.1 Prepare for use through Ethernet ................................................................................. 49
5.2.2 Prepare for use through MS/TP .................................................................................... 51
5.2.3 RS485 cable data ......................................................................................................... 55
5.3
6.2.1 Cable and motor insulation checks ............................................................................... 59
6.3
6.3.1 Frames MR4 to MR6..................................................................................................... 61
6.3.2 Frames MR7 and MR8.................................................................................................. 62
6.3.3 Frame MR9 ................................................................................................................... 63
Содержание SmartDrive HVAC
Страница 44: ...POWER CABLING Honeywell 42 4 Figure 39 ...
Страница 68: ...COMMISSIONING Honeywell 66 6 ...