Seite 87 von 99
C69 Continuous Measuring Runs With Pauses (b9450 / B9460 only).
Displayed on selection:
The digit "1" in the left display to indicate the step number. The first pause value in the right display.
Step 1 options:
Select the first pause period in seconds using the PLUS and MINUS keys. Confirm your selection using the
RETURN key.
Step 2 options:
The digit "2" in the left display to indicate the step number. The second pause value in the right display.
Select the second pause period in seconds using the PLUS and MINUS keys. Confirm your selection using
the RETURN key.
Step 3 options:
The digit "3" in the left display to indicate the step number.
Lower the hood to begin the measuring runs. The runs will continue to execute and results will be
displayed in grams. There will be a pause between each run and the balancer will beep repeatedly to
indicate that C69 is in progress.
Raise the hood at any stage to exit the code.
Содержание Snap-on Y2k
Страница 1: ...SERVICE of the Y2k balancing platform Seite 1 von 99 ...
Страница 2: ...The vibratory assemblies of the Y2k balancing platform L R L R S S M Seite 2 von 99 ...
Страница 10: ...S S M Fig 12 Two systems arranged one above the other with a parallel pair of springs Seite 10 von 99 ...
Страница 32: ......
Страница 35: ...Seite 35 von 99 ...
Страница 66: ...Seite 66 von 99 Figure 1 JBEG B9000 B9450 User Interface ...
Страница 67: ...Seite 67 von 99 Figure 2 JBEG B9460 User Interface ...