102 / 156
00BNO9168-I (U0606551)
VARMAX -
Installation, Use and Maintenance
WARNING:
Ensure the switches on extension module AVS75 are correctly
configured.
Diagrams: VX210 / VX220
page 4 / 8
D. SPECIFIC START-UP PROCEDURE
"
Fit the accessories and make their electrical connections.
"
Start up the boiler alone.
"
Make the following settings:
On boiler No. 1: master
Line No. Value
• Time and date
menu
Set the time
Time / minute (1)
HH.MM
Set the date
Day / month (2)
DD.MM
Set the year
Year (3)
YYYY
• Configuration
menu
Configure the DHW pump
(diagram
VX210)
QX2 relay outlet (5891)
Pump/valve ECS
Q3
Configure pump Q15
(diagram VX220)
QX2 relay outlet (5891)
Pump for circulation
circuit 1 Q15
Configure the flow sensor in cascade B10
Sensor input BX2 (5931)
Common flow
sensor B10
Configure input H1
(diagram VX220)
Input function H1 (5977)
Demand for
circulation circuit 1
Configure the extension module
Function of extension module 1 (6020)
Heating circuit 1
•
Configure as master in the cascade:
LPB network
menu
Appliance number
Appliance address (6600)
1
Segment number
Segment address (6601)
0
Set the bus power supply.
Bus supply function (6604)
Automatic
Set the clock mode
Clock function (6640)
Master
• Heating circuit 1
menu
Set the comfort setting
Comfort setting temperature (710) - - -
Set the curve slope
Heating curve slope (720) - - -
• Switch the heating mode to permanent comfort
Содержание VARMAX 120
Страница 11: ...14 09 2020 11 156 VARMAX Installation Use and Maintenance ...
Страница 44: ...44 156 00BNO9168 I U0606551 VARMAX Installation Use and Maintenance figure 33 Electrical wiring diagram ...
Страница 125: ...14 09 2020 125 156 VARMAX Installation Use and Maintenance ...
Страница 155: ...14 09 2020 155 156 VARMAX Installation Use and Maintenance ...