14.09.2020
109 / 156
VARMAX -
Installation, Use and Maintenance
L
N L3
N
L3 L
N
QX2
QX3
QX1
Mains supply 230
VAC 50 Hz
}
}
D. SPECIFIC START-UP PROCEDURE
"
Fit the accessories and make their electrical connections.
"
Start up the boiler alone.
"
Make the following settings:
On boiler No. 1: master
Line No. Value
• Time and date
menu
Set the time
Time / minute (1)
HH.MM
Set the date
Day / month (2)
DD.MM
Set the year
Year (3)
YYYY
• Configuration
menu
Configure the flow sensor in cascade B10
Sensor input BX2 (5931)
Common flow
sensor B10
For a demand via input 0...10V
Configure input H1
Input function H1 (5950)
Demand from
circulation circuit
1 10V
Voltage value 1 H1 (5953)
0.0
Alarm relay
Insulating
valve Q1.2
Diagram VX211
page 3 / 6
}
LPB bus
MB DB
Содержание VARMAX 120
Страница 11: ...14 09 2020 11 156 VARMAX Installation Use and Maintenance ...
Страница 44: ...44 156 00BNO9168 I U0606551 VARMAX Installation Use and Maintenance figure 33 Electrical wiring diagram ...
Страница 125: ...14 09 2020 125 156 VARMAX Installation Use and Maintenance ...
Страница 155: ...14 09 2020 155 156 VARMAX Installation Use and Maintenance ...