![background image](http://html1.mh-extra.com/html/hamworthy/varmax-120/varmax-120_installation-commissioning-and-servicing-instructions_589543088.webp)
88 / 156
00BNO9168-I (U0606551)
VARMAX -
Installation, Use and Maintenance
Maintenance optimisation:
It is possible to generate a maintenance message without harming the boiler. This maintenance
message may appear when the 3 following meters have elapsed:
• Time since last maintenance (or commissioning): set parameter 7044 to 12 months
• Operating hours of the burner (parameter 7040)
• Number of start-ups (parameter 7042)
The last 2 parameters depend on the boiler room's hydraulic installation. It is recommended to
use at least parameter 7044 for yearly maintenance.
Diagram VX113
page 4 / 5
Содержание VARMAX 120
Страница 11: ...14 09 2020 11 156 VARMAX Installation Use and Maintenance ...
Страница 44: ...44 156 00BNO9168 I U0606551 VARMAX Installation Use and Maintenance figure 33 Electrical wiring diagram ...
Страница 125: ...14 09 2020 125 156 VARMAX Installation Use and Maintenance ...
Страница 155: ...14 09 2020 155 156 VARMAX Installation Use and Maintenance ...