Chapter Four Operation
205
Part 2
Operation
Hold key is pressed.
The end point PB of the current block transfers to point PB’ due to the offset as a result of manual
operation and the vectors VB1 and VB2 of the original point PB also trasfer to VB1’ and VB2’
It’s not required to compensate the vector between the next two blocks (tool path from PB to PC
and the path from PC to PD). New vector with compensation
(
VC1
′
VC2
′
)
is generated from mutual
relationship between the two blocks (tool path from PB
′
and PC to PD, and the path from PC to PD).
However, the vector VB2
′
is identical with vector VB2, the offset can not be correctly executed on the
tool path between PB
′
and PC. However, for the blocks after point PC, tool offset can be executed
precisely.
Sample 2 If manual operation is inserted in corner machining in case of tool radius
compensation, the tool path after manual operation will be determined by the same method as
Example 1. Vectors VA2
′
,
VB1
′
and VB2
′
in the following figure are gotten by transferring the
vectors VA2
,
VB1 and VB2 separately by a jog move amount. New vectors result from vectors
V
C1
′
and V
C2.
Blocks after point PC will be precisely executed by tool radius compensation.
Содержание GSK983Ma
Страница 124: ......
Страница 130: ...GSK983Ma Milling Machine Center CNC System User Manual 118 Part 1 Programming Rapid traverse Cutting feed ...
Страница 133: ...Chapter Three Programming 121 Part 1 Programming Rapid traverse Cutting feed 6 G82 Drilling cycle boring ...
Страница 143: ......
Страница 185: ......
Страница 209: ...Chapter Four Operation 197 Part 2 Operation ...
Страница 239: ...Chapter Four Operation 227 Part 2 Operation ...
Страница 242: ......
Страница 279: ......
Страница 296: ...GSK983Ma Milling Machine Center CNC System User Manual 284 Part 2 Operation ...
Страница 297: ...Appendix 285 APPENDIX Appendix 1 System Version Display The system version is displayed immediately after power on ...
Страница 371: ...Appendix 11 USB Interface Parameter Transfer Operation ...