Cautions
V
Cautions
■
Transportation and storage
●
Do not pile the carton more than six layers.
●
Do not climb, stand or place the heavy on the carton.
●
Do not drag or move the production using the cable connected with the
production.
●
Do not bump the carton or scratch the panel and the display screen.
●
The product packing should be avoid the damp, sun and rain.
■
Checking
●
Confirm whether it is your purchased product after opening the packing.
●
Confirm whether the product is being damaged during transporting.
●
Confirm whether the spare parts are completed or being damaged.
●
If the unconfirmed type, the lack of accessories or the damage of transportation
may occur, touch our company freely.
■
Wiring
●
The wiring or checking should be performed with the professional.
●
Refer to the
Connection Manual
for the wiring.
●
The product should be grounded, and the grounding resistance should be less
than 0.1
Ω
. The neutral line (zero line) can not be replaced by the grounding.
●
The wiring should be correct and firm, so that the product malfunction or
undesired result may occur.
●
The surge absorber diode connected with this product should be connected in
the specified direction, or the product may be damaged.
●
The power should be cut off when Inserting or pulling out the plug or opening the
machine of the product
■
Detection
●
The man who is the professional can be detected the machine.
●
The power should be cut off before detecting or repairing or changing the
elements.
●
Checking the malfunction when the short-circuit or the overloading occurs, it can
be started after the malfunction is eliminated.
●
Never attempt to turn on/off the product frequently, if you want to start it again
after the power is turned off, it is necessary to wait for 1min at least.
Содержание GSK983Ma
Страница 124: ......
Страница 130: ...GSK983Ma Milling Machine Center CNC System User Manual 118 Part 1 Programming Rapid traverse Cutting feed ...
Страница 133: ...Chapter Three Programming 121 Part 1 Programming Rapid traverse Cutting feed 6 G82 Drilling cycle boring ...
Страница 143: ......
Страница 185: ......
Страница 209: ...Chapter Four Operation 197 Part 2 Operation ...
Страница 239: ...Chapter Four Operation 227 Part 2 Operation ...
Страница 242: ......
Страница 279: ......
Страница 296: ...GSK983Ma Milling Machine Center CNC System User Manual 284 Part 2 Operation ...
Страница 297: ...Appendix 285 APPENDIX Appendix 1 System Version Display The system version is displayed immediately after power on ...
Страница 371: ...Appendix 11 USB Interface Parameter Transfer Operation ...