![GSi Cumberland Hi-Lo Скачать руководство пользователя страница 75](http://html1.mh-extra.com/html/gsi/cumberland-hi-lo/cumberland-hi-lo_installation-and-operation-manual_2275052075.webp)
7. Installation
PNEG-250
Hi-Lo and PRO-1 Pan Feeders
75
10. Thread the 1/8" (0.3175 cm) drop cable through each pulley and attach it to the 3/16" (0.47625 cm)
winch cable about 6" (15 cm) from the pulley towards the winch with the 1/8" x 3/16" (0.3175 cm x
0.47625 cm) cable clamps.
11. Place the hangers to the feed line directly below each pulley by snapping the wire hanger (I) around
the rib of the tube.
Be sure the hangers are not touching the shocker wire.
Spread the wire hanger just enough to force it over the auger tube. The clip should be located within
6" (15 cm) (J) above the hanger, as shown in
. So the feeder line can be raised without
interference when the house is cleaned.
12. Cut the drop cable long enough for installation from the winch cable, through the hanger to the cable
adjustment clip.
Figure 7DO
13. Begin installing the drops at the winch and proceed to the end of the feeder line.
14. Clamp off the ends of the winch cable around a truss on the ends of the feeder line. Use a cable
clamp sleeve to clamp the drop cable to the winch cable. Thread the drop cable through the tube
hanger and adjustment clip. Cut the winch cable behind the cable clamp.
15. Level the feed line using the adjustment clips (H). Trim excess drop cable close to the clips.
Keep tension on hanging cables at all times to prevent the pans from resting in the litter.
Ref #
Description
H
Cable Adjustment Clip
I
Wire Hanger
J
6" (15 cm)