7. Installation
PNEG-250
Hi-Lo and PRO-1 Pan Feeders
35
Figure 7AJ Anti-Rotation Clip
Figure 7AK Tube Inserted into Slot on
Anti-Rotation Clip
5. Snap the two (2) anti-rotation clips together around each pan assembly on the tube to secure the
pans. Rotate the tube to position the bottom of the pans horizontal to the floor. Continue to the
next tube. There will be four (4) different positions that tubes will be rotated to.
Figure 7AL Anti-Rotation Clip Open
Figure 7AM Anti-Rotation Clip Snapped Together
6. Attach and secure tube clamps where tubes come together.
7. Attach the scissor hangers and S-Hooks the tube at the proper winching positions.
8. It is recommended to use Hi-Speed DDPU’s for all straight line pullet and breeder applications to
ensure adequate feed distribution.
9. Large volume hoppers with lower hopper switches are also recommended to ensure the tubes are
fully charged and ready for the next feeding when the system shuts down. Before feeding, be sure
to pre-fill the feed hoppers.