7. Installation
32
PNEG-250
Hi-Lo and PRO-1 Pan Feeders
Tubing Assembly
NOTE: Check to see that structural members are overhead to support winching the boot and hopper.
(See Winching Section on Page 70.)
1. Place the boot (A) in its approximate final position: Single boot at the end of the house, double boot
Assemble the auger tubing the length of the building,
starting with the bell end towards the boot (C).
Figure 7AC
Figure 7AD
Ref #
Description
A
Boot
B
1-3/4" Insulator Bracket Assembly
C
Belled End of Tube
Ref #
Description
C
Belled End of Tube
D
1-3/4" Tube Clamp
E
Straight End of Tube
Be careful, there are many sharp edges that can cut while assembling the
feedline. Wear protective clothing and gloves.
CAUTION
Every fifth (5
th
) auger tube should receive an insulator bracket assembly for
the shocker wire. Do not over tighten the tube clamps or distortion of the tubes
may result.
NOTICE