7. Installation
PNEG-250
Hi-Lo and PRO-1 Pan Feeders
79
Controls Installation
1. Mount master control box to the wall or other adequate surface. Unit should be mounted as close to
winch assembly as possible (not more than 15') only 20' of control cable is supplied. If control box
needs to be mounted further away then control cable must be spliced. FOR SAFETY OF OPERATION
WHEN RAISING THE SYSTEM YOU SHOULD BE ABLE TO SEE SYSTEM IN CASE OF
COMPONENT FAILURE.
2. Mount the winch motor to the motor mount (B) as shown in
using 5/16" x 3/4" bolts (E)
supplied in hardware bag. DO NOT LIFT MOTOR BY ELECTRICAL CORDS.
Figure 7DW
3. Remove belt guard from winch assembly (G). Attach motor mount assembly to the winch frame as
using 5/16" carriage bolts supplied in hardware bag.
4. Install drive pulley on motor shaft. Align with drive pulley on gearbox and tighten drive pulley.
5. Install belt onto the two (2) pulleys and check the belt alignment.
6. Tighten drive belt by adjusting bolts on motor mount.
IMPORTANT:
DO NOT OVER TIGHTEN
DRIVE BELT THIS WILL REDUCE LIFE OF MOTOR BEARINGS AND GEARBOX BEARINGS.
Replace belt guard on winch assembly.
Figure 7DX
Ref #
Description
A
1/3 HP Motor
B
Motor Mount
C
5/16" Nut
D
5/16" Lock Washer
E
5/16" x 3/4" Bolt
Ref #
Description
F
Motor/Motor Mount Assembly
G
Winch Assembly
H
5/16" x 3/4" Carriage Bolt