7. Installation
52
PNEG-250
Hi-Lo and PRO-1 Pan Feeders
If breaking the feed line is not an option, the double belled auger tube can be removed and the center
house control pan can then be clamped to the feed line as shown in
1. The outlet hole for the center house control pan and two (2) holes in front of the center house pan
must be enlarged.
2. Begin by enlarging the feed hole in the auger tube. Use a hacksaw and tin snips to cut out material
as shown in
. Make sure that there are no burrs on the inside of the auger that may
interfere with the auger operation.
Figure 7BZ
3. Remove the #10-24 x 2-1/4" machine screws and lid. Attached center house control pan to feed line
as shown in
.
Figure 7CA
Figure 7CB
Before
After