7. Installation
50
PNEG-250
Hi-Lo and PRO-1 Pan Feeders
Figure 7BV
Control Pan Assembly
Hi-Lo Center House Control Pan (All Clamp on Models)
is the Hi-Lo center house control pan with the pre-assembled double bell auger tube. The
center house control pan can be mounted between two (2) sections of auger tube by trimming one auger
bell as shown in
and installing it as shown in
1-3/4" U-bolts (included). Depending on the location of the control pan, you may need to install the control
pan between two (2) auger tube holes on one section of auger tube. In this case, cut the auger in half and
trim back the rib to install the control pan.
Figure 7BW
Ref #
Description
F
Vent Plug
F