Reverse osmosis system
GENO-OSMO RO 125K
Order no.
285 752 940-inter Edited by: phar-mrie G:\BA-752940-INTER_285_RO_125K.DOCX
33
1.3 Venting permeate output/pressure booster pump
Reinstall permeate line on collection tank (refer to fig. E-1).
Switch on the reverse osmosis system RO 125 K by pressing
the ▲ button. The system produces permeate in the tank.
Note:
Below only for reverse osmosis system RO-125 K-TS.
The pressure booster pump is vented when permeate flows out of
the venting/sample valve (refer to fig. E-3, no. 1), (duration to
permeate flow is approx. 15 minutes). Close the vent valve.
Plug the pressure switch plug (refer to fig. E-4, no. 1) into the
pressure switch – the pressure booster pump starts pumping.
Note:
In order for the booster pump to reach its cut-off pressure,
the downstream line must also be vented. Therefore, it is imperative
to establish permeate consumption.
Switch-on pressure approx. 1.8 bar; switch-off pressure approx. 3.0
bar.
Fig. E-3: Venting pressure booster
Fig. E-4: Pressure switch pressure booster